This is a demo store. No orders will be fulfilled.

A-Joint Pro - Paving Grouting (Jointing Compound)

Quick Find Code: 050084

A-Joint Pro - Paving Grouting (Jointing Compound)

Quick Find Code: 050084
Grouped product items
Product Name Price inc VAT Qty
Neutral - 25Kg
£90 .00  per item
inc VAT
Stone Grey - 25Kg
£90 .00  per item
inc VAT
Basalt - 25Kg
£90 .00  per item
inc VAT
delivery included

A-Joint Pro is perfect for heavier trafficked areas as it is load-bearing up to 12 tonnes. 

A-Joint is top quality and is resistant to frost, ice, salt, weeds, and abrasions. which is particularly suitable for narrow and extra-wide joints due to its self-compacting properties and high flowability. What's more, it is also very cost-effective and can permanently fix the joints between almost all natural and concrete paving types without using a lot at a time. We are a major stockist of all 3 A-Joint colours. 

Neutral is a buff sand-like colour, Stone Grey is as the name suggests a light grey, and Basalt is a dark grey almost charcoal colour suited to darker paving options. 

More Information
Quick Find Code 050084
Manufacturer A-Joint
Container Coverage 1 tub covers 15 - 20sqm on a 15.3sqm patio pack of paving slabs, please see spec for indepth measurements
Container Size 25kg
Size NA
Usage Instructions

Prepare:

The joints must be cleaned of weeds, roots and loose parts without leaving any residue and cleared to a depth of at least 25 mm (2/3 of the stone height for traffic load). The surface to be grouted must be freed from all dirt. Adjacent areas that are not to be grouted should be masked or covered. To avoid settling and loose stones, we recommend a permanently water-permeable and load-bearing substrate corresponding to the subsequent load (pay attention to the current standards and guidelines). We generally recommend the bonded construction method.

Pre-Wetting

Pre-wet the entire surface extensively. Higher soil temperatures and absorbent, open-pored stones require more intensive pre-wetting. Generally, use clean and cold water.

Mixing bucket

Open the bucket. Pour the bottle inside completely to the sand component. Fill the emptied bottle to ¼ = 0.25 litres of water and close it, shake vigorously and add to the mixture. Make sure the bottle is completely empty. Use a professional stirring or mixing device. Start the mixing process and mix thoroughly for at least 6 minutes until a creamy, flowing mass is obtained. No further addition of water is necessary.

Filling the joints:

Pour the finished mixture onto the well pre-wetted surface. Work in the jointing compound carefully and as diagonally as possible to the joints using a rubber squeegee. To make the most of the flowability, it is recommended to divide this mixture into two to three portions. Mix the remaining joint compound again briefly. Keep the surface constantly wet during this work.

Cleaning the surface:

After approx. 10-20 minutes, sweep the stone surface carefully and diagonally to the joint with a medium-coarse street broom. If white gel-like streaks form on the stone surface, the correct sweeping time has not yet been reached. Then remove the remaining mortar residues with a fine coconut broom. Material that has been swept off should no longer be used. Be aware that chamfers (bevelling of the side edges) on slabs and pavers must be exposed.

Our standard method of delivery for heavy items is using the pallet delivery network. The delivery will arrive on a lorry with an electric tailift and a hand pump truck. 

Access must be made for a lorry (up to 32ft) otherwise additional delivery charges may be payable. You must advise us of any restrictions that will impede the delivery vehicles from delivering the Products. The Products will be delivered to the kerbside outside. Our couriers are not insured to take goods onto your premises without permission. If you require the driver to come onto your property (at their discretion and deemed safe) with the wagon, the Products, or both, this is entirely at your own risk and if the driver or wagon damages anything (including but not limited to, manhole covers, tarmac driveways, block paved drives, flagged driveways / graveled or stoned driveways, grassed areas, walls, pillars, gate posts, gates, trees, hedges, telephone wires, lights) the cost of repair will be your responsibility.

Ensure that the delivery area is flat and solid enough to take the weight of a pallet truck carrying up to 1000kg in weight. Please note Gravel and Grass are not classed as solid and flat. If the delivery area is not flat the driver will require help in getting the pallets off the vehicle. If help cannot be given there will be a redelivery charge to deliver at a time when help can be given. If you live on a hill you will need to call us before you order to find out if our delivery company can deliver to your address. This is for health and safety reasons, usually the easiest method of getting around this is for the order to be delivered to the nearest flat ground. It will be your responsibility to move the goods to your property. Deliveries via hiab or moffet can be arranged but at an additional cost, click for further details.

Smaller items will be delivered via a parcel courier.   

All delivery methods will require someone to accept the delivery, check it over and sign that they have been received in good condition. Please note any damages on the delivery sheet / electronic device, do not use the product and contact us straight away.

Next day, AM/PM or even Saturday deliveries can be arranged at an extra cost. Please add your items to the shopping cart for an instant quote.

Pallet Deliveries

After your order has been dispatched you will be contacted on the phone (within 3 days), by your local pallet delivery company in your area, once they receive the goods from our local depot, to book-in a day that is convenient for you. (this will not occur on Timed, Next Day & Saturday deliveries)

Parcel Deliveries

After your order has been dispatched you will receive your goods within 2-3 days. No telephone book-in will occur.

Remember when handling your goods:

  • Take care when removing the packaging / banding and also when removing the product out of the crate / pallet as they may have weakened during transit and could be unstable.
  • The product is quite heavy, and some larger products can weigh a lot. Consider this when arranging the delivery, as you may need appropriate lifting equipment, or an extra pair of hands.

To ensure you prepare adequately for pallet deliveries please watch the video below for a comprehensive guide and also read the full delivery guide https://lsd.co.uk/delivery-details

Delivery Details Icons

       Frequently Asked Questions and Answers